Skip to main content
Advanced Search
Search Terms
Content Type

Exact Matches
Tag Searches
Date Options
Updated after
Updated before
Created after
Created before

Search Results

755 total results found

3. SPECIFICATIONS

ESTUN- General Lerge Peyloads Series Ro...

3.1. ROBOT CONFIGURATION (Note 1) During short distance motions, the axis speed may not reach the maximum value stated. The maximum speed is measured at zero position of the robot, and will be limited by the position of other axes.(Note 2) When the ...

4. EQUIPMENT INSTALLATION TO THE ROBOT

ESTUN- General Lerge Peyloads Series Ro...

4.1. FLANGE DIMENSIONThis section describes the mounting face dimension of the end effector. Consider the depth of the screw holes and pin holes sufficiently before choose the length of the bolts and pins. Antirust measures of screws, grippers, etc., should be...

5. CHECK AND MAINTENANCE

ESTUN- General Lerge Peyloads Series Ro...

Before performing any maintenance, be sure to read SAFETY PRECAUTIONS and understand the content. 5.1. DAILY CHECKSCheck the items below before daily operation as occasion demands 5.2. PERIODIC CHECKS AND MAINTENANCECheck the items at the intervals recommen...

6. ZERO CALIBRATING

ESTUN- General Lerge Peyloads Series Ro...

6.1. INTRODUCTIONCalibration associates the angle of each robot axis with the pulse count value supplied from the absolute Pulsecoder connected to the corresponding axis motor. To be specific, calibration is an operation for obtaining the pulse count value, co...

7. TROUBLESHOOTING

ESTUN- General Lerge Peyloads Series Ro...

Be sure to read SAFETY PRECAUTIONS and understand its contents before any maintenance. 7.1. TOOLSTroubleshooting tools includes travelling crane, forklift, internal hexagonal wrench, monkey wrench and special tools for removing the bearings. 7.2. Troubleshoot...

APPENDIX

ESTUN- General Lerge Peyloads Series Ro...

APPENDIX A BOTL TORQE LIST   APPENDIX B SPECIFICATION OF BOLT   APPENDIX C Part list for ER100B-3000   APPENDIX D Part list for ER100B-3500-DW   APPENDIX E Part list for ER130B-3200   APPENDIX F Part list for ER160B-3200   APPENDIX G Part list for ER170B...

REVISION RECORD

ESTUN- General Lerge Peyloads Series Ro...

Instructions for Safe Use

ESTUN- General Small Payloads Series Ro...

This Chapter describes the content to be observed for the safe use of the robot. Before using, be sure to read and understand the content in this Chapter.Companies and individuals using ESTUN Robotics should be familiar with the local and national standards an...

Preface

ESTUN- General Small Payloads Series Ro...

This manual is applicable to the following robot type.   List of relevant instructions  

1.Transportation & Installation

ESTUN- General Small Payloads Series Ro...

1.1. Transportation Before moving the robot, position each joint of the robot into the handling position to ensure that the robot remains in the handling position without any movement or displacement during transportation.The robot should maintain the handlin...

2. Connection with the Controller

ESTUN- General Small Payloads Series Ro...

The figure below shows the cables connect the robot with the controller. Connect these cables on the back of the base.

3. Specification

ESTUN- General Small Payloads Series Ro...

3.1. Robot configuration Figure 3.2 Robot configuration (ER12B-1510-LI, ER12B-1510) (Note 1) During short distance motions, the axis speed may not reach the maximum value stated.(Note 2) When the robot is used in low temperature environment that is near 0℃ ...

4. Equipment Installation

ESTUN- General Small Payloads Series Ro...

4.1. End flange mounting interfaceThis section describes the mounting face dimension of the end flange. Consider the depth of the screw holes and pin holes sufficiently before choose the length of the bolts and pins. Antirust measures of screws, grippers, etc....

5. Check and Maintenance

ESTUN- General Small Payloads Series Ro...

Before performing any maintenance, be sure to read SAFETY PRECAUTIONS in Chapter 1 and understand the content.   5.1. Daily checksCheck the items below before daily operation as occasion demands.   5.2. Periodic checks and maintenancePerform maintenance and ...

6. Zero Calibration

ESTUN- General Small Payloads Series Ro...

6.1. IntroductionZero Calibration associates the angle of each robot axis with the pulse count value supplied from the absolute Pulsecoder connected to the corresponding axis motor. To be specific, zero alibration is an operation for obtaining the pulse count ...

7. Troubleshooting

ESTUN- General Small Payloads Series Ro...

Be sure to read SAFETY PRECAUTIONS in Chapter 1 and understand its contents before any maintenance.   7.1. ToolsTroubleshooting tools includes travelling crane, forklift, internal hexagonal wrench, monkey wrench and special tools for removing the bearings. 7....

Appendix

ESTUN- General Small Payloads Series Ro...

Appendix A Screw tightening torque list   Appendix B Specifications and technical parameters of chemical bolts   Appendix C List of recommended spare parts for ER20B/10- 2010-HI (required for one unit/set)   Appendix D List of recommended spare parts for ER...

Revision Record

ESTUN- General Small Payloads Series Ro...